{"id":1481,"date":"2017-03-23T12:51:40","date_gmt":"2017-03-23T11:51:40","guid":{"rendered":"http:\/\/www.enertis.es\/enertis-quality-59mwp-photovoltaic-actis\/"},"modified":"2023-09-13T10:05:35","modified_gmt":"2023-09-13T08:05:35","slug":"enertis-quality-59mwp-photovoltaic-actis","status":"publish","type":"post","link":"https:\/\/enertisapplus.com\/es\/enertis-quality-59mwp-photovoltaic-actis\/","title":{"rendered":"Enertis controla la calidad de 59MWp m\u00f3dulos fotovoltaicos de Actis"},"content":{"rendered":"<ul>\n<li><strong>El proyecto compuesto por m\u00e1s de 180.000 m\u00f3dulos fotovoltaicos de Trina Solar.<\/strong><\/li>\n<\/ul>\n<p>Enertis ha sido elegida por Actis, inversor l\u00edder en mercados en crecimiento de Africa, Asia y Am\u00e9rica Latina, para asegurar y controlar la calidad de un suministro de m\u00f3dulos fotovoltaicos de 59 MWp.<\/p>\n<p>El lote de m\u00f3dulos ser\u00e1 instalado en el proyecto Naranjal, en Uruguay y se prev\u00e9 su control de calidad en la fase de producci\u00f3n en China y Malasia<\/p>\n<p>Durante la inspecci\u00f3n, realizada en factor\u00edas de China y Malasia, Enertis llevar\u00e1 a cabo una supervisi\u00f3n exhaustiva de la fabricaci\u00f3n diaria, as\u00ed como una serie de pruebas de aceptaci\u00f3n de lotes de producto, durante todo el per\u00edodo de fabricaci\u00f3n establecido. Gracias a la aplicaci\u00f3n de estas actividades de control de calidad, se reduce notablemente el riesgo t\u00e9cnico (y, por ende, financiero) asociado a posibles fallos en los materiales y m\u00f3dulos fotovoltaicos a suministrar, adem\u00e1s de asegurar una mayor fiabilidad a lo largo todo su ciclo de vida garantizado (25 a\u00f1os).<\/p>\n<p>Con este contrato, Enertis acumula una experiencia creciente en servicios de control de calidad en Asia de alrededor de 2.000 MWp.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El proyecto compuesto por m\u00e1s de 180.000 m\u00f3dulos fotovoltaicos de Trina Solar. Enertis ha sido elegida por Actis, inversor l\u00edder [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[39,41,212,37],"tags":[],"class_list":["post-1481","post","type-post","status-publish","format-standard","hentry","category-control-de-calidad","category-fotovoltaica","category-nota-prensa","category-quality-control"],"acf":[],"_links":{"self":[{"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/posts\/1481","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/comments?post=1481"}],"version-history":[{"count":2,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/posts\/1481\/revisions"}],"predecessor-version":[{"id":1485,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/posts\/1481\/revisions\/1485"}],"wp:attachment":[{"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/media?parent=1481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/categories?post=1481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enertisapplus.com\/es\/wp-json\/wp\/v2\/tags?post=1481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}