{"id":2020,"date":"2017-09-12T18:56:36","date_gmt":"2017-09-12T16:56:36","guid":{"rendered":"http:\/\/www.enertis.es\/frv-relies-on-enertis-to-control-quality-of-solar-pv-panels-jordan\/"},"modified":"2023-09-13T09:37:18","modified_gmt":"2023-09-13T07:37:18","slug":"frv-relies-on-enertis-to-control-quality-of-solar-pv-panels-jordan","status":"publish","type":"post","link":"https:\/\/enertisapplus.com\/fr\/frv-relies-on-enertis-to-control-quality-of-solar-pv-panels-jordan\/","title":{"rendered":"FRV relies on Enertis to control the quality of more than 400,000 solar PV panels to be installed in Jordan"},"content":{"rendered":"<p><em>The \u2018Mafraq\u2019 project, that consists of two solar facilities of 50 MWac each and started construction at the end of May, is comprised overall of more than 400,000 monocrystalline silicon modules of a Chinese Tier-1 manufacturer.<\/em><\/p>\n<p>Enertis currently supports Fotowatio Renewable Ventures (FRV) as independent technical advisor to ensure and control the quality of a photovoltaic modules supply of more than 400,000 panels. The batch is to be installed at the \u2018Mafraq I\u2019 and \u2018Mafraq II\u2019 plants in the homonymous Jordanian governorate, one of the areas with the highest solar irradiation in the region.<\/p>\n<p>Prior to the manufacturing of the project\u2019s modules, Enertis has carried out a factory inspection to validate all the production processes. This evaluation included revisions concerning the supply, storage and traceability of the raw materials. Currently, Enertis conducts a comprehensive supervision of the daily production, throughout all the production process\u2019 steps, to keep a full consistency in the product quality over the 100MWac supply. The supervision comprises also a series of technical tests conducted on randomly selected modules regarding the product batches acceptance. Those tests are performed both at the manufacturer\u2019s laboratories, under strict control of Enertis, as well as at Enertis\u2019 accredited partner laboratory in Shanghai.<\/p>\n<p>Overall, the duties carried out by Enertis are going to last about six months, summing some 2,000 on-site inspection hours. Thanks to the implementation of these quality control activities, the technical risk associated to possible failures in the materials and PV modules is lessened, besides ensuring more reliability during their life cycle.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u2018Mafraq\u2019 project, that consists of two solar facilities of 50 MWac each and started construction at the end of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[62,65,70,246,67],"tags":[],"class_list":["post-2020","post","type-post","status-publish","format-standard","hentry","category-control-de-calidad-fr","category-fotovoltaica-fr","category-photovoltaics-2-fr","category-press-release-fr","category-quality-control-fr"],"acf":[],"_links":{"self":[{"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/posts\/2020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/comments?post=2020"}],"version-history":[{"count":1,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/posts\/2020\/revisions"}],"predecessor-version":[{"id":2021,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/posts\/2020\/revisions\/2021"}],"wp:attachment":[{"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/media?parent=2020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/categories?post=2020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enertisapplus.com\/fr\/wp-json\/wp\/v2\/tags?post=2020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}